Precision from carcass to handover

Coordinating structure, services and finishes so the last stage is not a rescue operation.

Every High Park delivery moves through the same four stages, in the same order: carcass, design development, vendor collaboration, completion. The order isn’t bureaucratic — it’s what lets structural, MEP and finishing trades all work toward one handover date instead of three separate ones.

The carcass stage sets everything downstream. We oversee the shell’s delivery alongside the structural engineer and services consultants, because an error built in here — a riser out of position, a floor-to-floor height a fraction short — isn’t inherited by the next trade. It’s inherited by every trade after it.

Design keeps developing against that shell rather than freezing at the start. Site conditions surface things no drawing anticipates, and resolving them here — before anything is ordered against the design — is what stops a later stage from having to unpick a decision that’s already been fabricated.

Only then are vendors brought in, against a design that has actually settled rather than one still moving. FF&E and specialist trades are sequenced to the as-built structure and the resolved detail, which is what keeps a bespoke fitting from arriving to a wall, or a junction, that changed after it was ordered.

Completion, done properly, is uneventful. If the first three stages ran in that order, handover is staging and inspection — not the point where the problems finally surface.